An accuracy study has been made by calculating the RMSE for digital model,
using 24 GCPs (Table 37.2) (Fig. 37.7).
RMSE ¼
ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi ffi
P N
i¼1 Z DTM À Z REF
ð
Þ
2
n
s
ð37:1Þ
Where:
Z DTM – the points elevation from the model
Z REF – the points elevation as references
n – the number of ground control points.
Fig. 37.5 (a) Automatic generation of DTM, (b) DTM editing
Fig. 37.6 (a) DTM, (b) DSM
622
I. Vizireanu and R. Mateescu
using 24 GCPs (Table 37.2) (Fig. 37.7).
RMSE ¼
ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi ffi
P N
i¼1 Z DTM À Z REF
ð
Þ
2
n
s
ð37:1Þ
Where:
Z DTM – the points elevation from the model
Z REF – the points elevation as references
n – the number of ground control points.
Fig. 37.5 (a) Automatic generation of DTM, (b) DTM editing
Fig. 37.6 (a) DTM, (b) DSM
622
I. Vizireanu and R. Mateescu
