14
J. Bujnak et al.
Acknowledgements The paper presents results of the research activities supported partly by the
Slovak Science Grant Agency; grant No. 1/0343/18.
References
1. https://ec.europa.eu/transport/themes/infrastructure/ten-t_en
2. EN 1991-2 Eurocode 1 (2006) Actions on structures—part 2: traffic loads on bridges. CEN
3. Gandil J, Tschumi MA, Delorme F, Voignier P (1996) Railway traffic actions and combinations
with other variable actions. IABSE Reports, Zürich
4. Esveld C, Kok AWM (2013) Interaction between moving vehicles and railway track at high
speed. In: Proceedings of the first international workshop. Issues & Challenges, UIC Paris
Ballast
5. Bujnak J, Odrobinak J, Kvocak V, Kozlejova V (2019) Composite steel and concrete structures.
Some aspects of appropriate design. University of Zilina, Monograph, p 102
6. Rheda ® ballastless track system. https://www.railone.com/
7. Bujnak J, Bujnakova P (2020) Bridges. Conception and construction. University of Zilina,
Handbook, p 186
Précédent

- 30/222

Suivant