Table 12.2 Number of
planned investments, with the
type of investments as
construction of reservoirs, in
individual water regions of
River Basin Management
Plans
Water regions
Number of investments
Small Vistula
2
Black Orawa
2
Upper Vistula
24
Middle Vistula
35
Lower Vistula
13
Lyna and Wilgorapa
3
Pregola
1
Niemen
4
Upper Oder
2
Middle Oder
12
Warta
16
Lower Oder and West Przymorze
Rivers
18
The spatial distribution of investments planned for implementation in the second
RBMP planning cycle in Poland is shown in Fig. 12.9. The most important investments affecting the continuity of river sediment transport are listed in Table 12.3.
Fig. 12.9 Location of the planned investment in the second cycle of River Basin Management
Plans on the background of SWB (map prepared by D. Szatten)
M. Habel et al.
Table 12.2 Number of
planned investments, with the
type of investments as
construction of reservoirs, in
individual water regions of
River Basin Management
Plans
Water regions
Number of investments
Small Vistula
2
Black Orawa
2
Upper Vistula
24
Middle Vistula
35
Lower Vistula
13
Lyna and Wilgorapa
3
Pregola
1
Niemen
4
Upper Oder
2
Middle Oder
12
Warta
16
Lower Oder and West Przymorze
Rivers
18
The spatial distribution of investments planned for implementation in the second
RBMP planning cycle in Poland is shown in Fig. 12.9. The most important investments affecting the continuity of river sediment transport are listed in Table 12.3.
Fig. 12.9 Location of the planned investment in the second cycle of River Basin Management
Plans on the background of SWB (map prepared by D. Szatten)