References
265
References
Altarejos-García L, Silva-Tulla F, Escuder-Bueno I, Morales-Torres A (2015) Practical risk assessment for embankments, dams, and slopes, Risk and Reliability in Geotechnical Engineering, ed.
Kok-Kwang Phoon & Jianye Ching, Chap. 11, Taylor & Francis
Bouder F, Slavin D, Loefstedt R (eds.) (2007) The Tolerability of Risk: A New Framework for Risk
Management, Earthscan
Brehaut H (2017) Catastrophic dam failures path forward, Keynote lecture, Tailings and Mine Waste
2017, Banff, Nov 5–9, 2017
Caldwell J, Oboni F, Oboni C (2015) Tailings Facility Failures in 2014 and an Update on Failure
Statistics, Tailings and Mine Waste 2015, Vancouver, Canada, October 25–28 2015 https://open.
library.ubc.ca/media/download/pdf/59368/1.0320843/5
Chapman C, Ward S (2011) The Probability-impact grid - a tool that needs scrapping, in: How to
manage Project Opportunity and Risk, 3rd ed., ch. 2, pp 49–51, Chichester, GB, John Wiley &
Sons
Cox LA Jr, Babayev D, Huber W (2005) Some limitations of qualitative risk rating systems, Risk
Analysis 25(3): 651–662
Espinoza, D (2015) The cost of risk: an alternative to risk adjusted discount rates, 10.13140/
RG.2.1.4040.6643
Hance B, Chess C, Sandman P (1987) Improving Dialogue with Communities: A Risk Communication Manual for Government. Trenton, New Jersey, Office of Science and Research, New
Jersey Department of Environmental Protection, December, 1987
Hubbard D (2009) Worse than Useless. The most popular risk assessment method and Why it
doesn’t work, in: The Failure of Risk Management. Ch. 7, pp. 117–144, Hoboken, Wiley & Sons
Kahneman D, Tversky A (1979). Prospect theory: An analysis of decision under risk. Econometrica,
47, 263–291.
[MVRB 2013] MacKenzie Valley Review Board (2013) Report of Environmental Assessment and
Reasons for Decision Giant Mine Remediation Project http://reviewboard.ca/upload/project_
document/EA0809-001_Giant_Report_of_Environmental_Assessment_June_20_2013.PDF
Oboni C, Oboni F (2013) Factual and Foreseeable Reliability of Tailings Dams and Nuclear Reactors
-a Societal Acceptability Perspective, Tailings and Mine Waste 2013, Banff, AB, November 6 to
9, 2013
Oboni C, Oboni F (2018) Geoethical consensus building through independent risk assessments.
Resources for Future Generations 2018 (RFG2018), Vancouver BC, June 16–21, 2018
Oboni F, Oboni C (2016) A systemic look at tailings dams failure process, Tailings and Mine Waste
2016, Keystone CO, USA, October 2–5, 2016 https://www.riskope.com/wp-content/uploads/
2016/10/Paper-17_A-systemic-look-at-TD-failure-TMW-2016_07-11_revised.pdf
[Oboni et al. 2013] Oboni F, Oboni C, Zabolotniuk S (2013) Can We Stop Misrepresenting Reality
to the Public?, CIM 2013, Toronto. https://www.riskope.com/wp-content/uploads/Can-We-StopMisrepresenting-Reality-to-the-Public.pdf
[Oboni and MDA 2018] Oboni Riskope Associates Inc., MacDonald Dettwiler and Associates,
Ltd. (2018) Tailings 2.0 course: Space observation, quantitative risk assessment bring value and
comply with societal demands, Tailings and Mine waste 2018, Keystone, Colorado
Robichek AA, Myers SC (1966) Conceptual Problems in the Use of Risk-Adjusted Discount Rates.
The Journal of Finance, Vol. 21, No. 4 (Dec., 1966), pp. 727–730
Roche C, Thygesen K, Baker, E (eds.) (2017) Mine Tailings Storage: Safety Is No Accident.
A UNEP Rapid Response Assessment. United Nations Environment Programme and GRIDArendal, Nairobi and Arendal, ISBN: 978-82-7701-170-7 http://www.grida.no/publications/383
Silva F, Lambe TW, Marr WA (2008) Probability and Risk of Slope Failure, Journal of
Geotechnical and Geoenvironmental Engineering 134(12) https://doi.org/10.1061/(ASCE)10900241(2008)134:12(1691).
Taguchi G (2014) Fault Tree Analysis of Slurry and Dewatered Tailings Management – A Frame
Work, Master’s thesis, University of British of Columbia
265
References
Altarejos-García L, Silva-Tulla F, Escuder-Bueno I, Morales-Torres A (2015) Practical risk assessment for embankments, dams, and slopes, Risk and Reliability in Geotechnical Engineering, ed.
Kok-Kwang Phoon & Jianye Ching, Chap. 11, Taylor & Francis
Bouder F, Slavin D, Loefstedt R (eds.) (2007) The Tolerability of Risk: A New Framework for Risk
Management, Earthscan
Brehaut H (2017) Catastrophic dam failures path forward, Keynote lecture, Tailings and Mine Waste
2017, Banff, Nov 5–9, 2017
Caldwell J, Oboni F, Oboni C (2015) Tailings Facility Failures in 2014 and an Update on Failure
Statistics, Tailings and Mine Waste 2015, Vancouver, Canada, October 25–28 2015 https://open.
library.ubc.ca/media/download/pdf/59368/1.0320843/5
Chapman C, Ward S (2011) The Probability-impact grid - a tool that needs scrapping, in: How to
manage Project Opportunity and Risk, 3rd ed., ch. 2, pp 49–51, Chichester, GB, John Wiley &
Sons
Cox LA Jr, Babayev D, Huber W (2005) Some limitations of qualitative risk rating systems, Risk
Analysis 25(3): 651–662
Espinoza, D (2015) The cost of risk: an alternative to risk adjusted discount rates, 10.13140/
RG.2.1.4040.6643
Hance B, Chess C, Sandman P (1987) Improving Dialogue with Communities: A Risk Communication Manual for Government. Trenton, New Jersey, Office of Science and Research, New
Jersey Department of Environmental Protection, December, 1987
Hubbard D (2009) Worse than Useless. The most popular risk assessment method and Why it
doesn’t work, in: The Failure of Risk Management. Ch. 7, pp. 117–144, Hoboken, Wiley & Sons
Kahneman D, Tversky A (1979). Prospect theory: An analysis of decision under risk. Econometrica,
47, 263–291.
[MVRB 2013] MacKenzie Valley Review Board (2013) Report of Environmental Assessment and
Reasons for Decision Giant Mine Remediation Project http://reviewboard.ca/upload/project_
document/EA0809-001_Giant_Report_of_Environmental_Assessment_June_20_2013.PDF
Oboni C, Oboni F (2013) Factual and Foreseeable Reliability of Tailings Dams and Nuclear Reactors
-a Societal Acceptability Perspective, Tailings and Mine Waste 2013, Banff, AB, November 6 to
9, 2013
Oboni C, Oboni F (2018) Geoethical consensus building through independent risk assessments.
Resources for Future Generations 2018 (RFG2018), Vancouver BC, June 16–21, 2018
Oboni F, Oboni C (2016) A systemic look at tailings dams failure process, Tailings and Mine Waste
2016, Keystone CO, USA, October 2–5, 2016 https://www.riskope.com/wp-content/uploads/
2016/10/Paper-17_A-systemic-look-at-TD-failure-TMW-2016_07-11_revised.pdf
[Oboni et al. 2013] Oboni F, Oboni C, Zabolotniuk S (2013) Can We Stop Misrepresenting Reality
to the Public?, CIM 2013, Toronto. https://www.riskope.com/wp-content/uploads/Can-We-StopMisrepresenting-Reality-to-the-Public.pdf
[Oboni and MDA 2018] Oboni Riskope Associates Inc., MacDonald Dettwiler and Associates,
Ltd. (2018) Tailings 2.0 course: Space observation, quantitative risk assessment bring value and
comply with societal demands, Tailings and Mine waste 2018, Keystone, Colorado
Robichek AA, Myers SC (1966) Conceptual Problems in the Use of Risk-Adjusted Discount Rates.
The Journal of Finance, Vol. 21, No. 4 (Dec., 1966), pp. 727–730
Roche C, Thygesen K, Baker, E (eds.) (2017) Mine Tailings Storage: Safety Is No Accident.
A UNEP Rapid Response Assessment. United Nations Environment Programme and GRIDArendal, Nairobi and Arendal, ISBN: 978-82-7701-170-7 http://www.grida.no/publications/383
Silva F, Lambe TW, Marr WA (2008) Probability and Risk of Slope Failure, Journal of
Geotechnical and Geoenvironmental Engineering 134(12) https://doi.org/10.1061/(ASCE)10900241(2008)134:12(1691).
Taguchi G (2014) Fault Tree Analysis of Slurry and Dewatered Tailings Management – A Frame
Work, Master’s thesis, University of British of Columbia