September, 2014, between federal and regional partners (i.e., specifically MI,
ANA and FUNCEME), valid until December, 2015. (6) The MoU defines an
institutional arrangement for the DM, an operational structure, and transition
rules, with MI and ANA assuming key-roles in the governance (roles that are
currently being supported by the strongest regional leader of this partnership,
FUNCEME). The DM, as evidenced by the MoU, is also evidence of collaboration through established networks with defined governance rules, a milestone
designed for the Northeast Regional Drought Preparedness track. The DM has
been considered a concrete and tangible technological and institutional upgrade,
and to some extent, it is buffered from strong political influence and politicization. The GoB considers the DM the foundation upon which any future NDP
might be built.
• In mid-2014, halfway through the program, the MI requested additional assistance to the WB to evaluate the impacts and costs of the current drought across
the Northeast to support improvements in vulnerability/resilience and impact
assessment (progressing towards pillar 2 of the 3 drought preparedness pillars).
This represents another concrete step towards institutionalization of a paradigm
shift on drought management. (4)
(8)Water Agencies
from Ceará (CE)
and Pernambuco
(PE)
institutionalizing
DP measures with
internal decrees
(6) MI + ANA + FUNCEME
sign MoU to operate
drought monitor
(institutionalizaon in state
and federal levels)
(7) Water Agencies
in CE and PE
implementing the
DPP
(10) State of Ceará
includes drought
preparedness and
drought monitor in
the living with the
drought state plan
(9) Water Agency in CE
hires a consultant to
develop other DPPs
(2) Water, Climate
and Agriculture
agencies in state
and federal levels
sharing data and
producing monthly
Drought Monitor
map
(3) Multisector actors
in different levels
actively involved in
the design of 5
Drought Preparedness
Plans (DPP)
(11) PiquetCarneiro Rain-fed
agriculture DPP
approved as a
model to
multiply across
Ceará,
and to feed into
the state plan.
(1) Ministry of
Integration (MI)
promotes regional
meetings to discuss
policies for semi-arid
region.
(5) Drought Monitor
(DM) and DPPs included
in final report of the MI
regional seminars
(4) Ministry of
Integration (MI)
requests study about
drought costs and
impacts
2014
2015
Fig. 17.4 Mapping of Drought NLTA key-outcomes harvested from May 2014 to January 2015
318
E. Bretan and N.L. Engle
Précédent

- 330/365

Suivant