157
2. Territorial and urban planning:
(a) set the energy local supply of public interest to be installed or renovated and
the corresponding location
(b) can decide to implement transformation interventions where there are infrastructures for renewable energy production, recovery, transportation and distribution or where their construction is planned
3. Municipalities, in the framework of their legislative powers on urban planning
and construction activities, acknowledge the minimum qualifications for energy
performance set by the regional council and can decide not to put them in place
in case of the categories listed in art. 4 paragraph 3, directive 2002/91/CE.
4. Municipalities operate in order to:
(a) in case of new urbanization interventions on a surface bigger than 1.000 mq,
get the assessment of technical and economical feasibility for installing
renewable energy plants, cogeneration, heat pumps, centralised heating and
cooling systems;
(b) in case of newly constructed buildings with centralised heating systems,
requesting of putting in place systems for temperature control and heat
accounting for each habitation unit;
(c) in case of newly constructed public buildings or buildings used for public
scopes, respect the obligation of using renewable energies and adopt electronic control systems;
(d) in case of interventions according to art. 6 of the regional law n. 31 of 25th
November 2002 (General construction discipline) on existing buildings with
a surface bigger than 1.000 mq, improve their energy performance with the
aim of meeting the minimum qualifications described in art. 25, paragraph 1,
letter a) of this law and of creating the conditions to put in place systems for
heat accounting for each habitation unit.
Regional Energy Plan (PER)
PER was approved by the Resolution of the regional Assembly n. 141 of 14th
November 2007. The Plan complies with the general objectives of the energy policy
of the Regional Law n. 26/04 and with the Community and State fundamental principles. It set the objectives, the tools and the guidelines for the actions to be carried
out by Emilia-Romagna Region and the local authorities on its territory with regards
to:
– energy spare
– renewable energies promotion
– improvement of the territorial energy performances, especially as far as the
buildings, SMEs, mobility, distributed energy systems, agriculture and forest
sectors are concerned
– improvement of security, continuity and cheapness of internal delivery
6 UHI in the Metropolitan Cluster of Bologna-Modena...
2. Territorial and urban planning:
(a) set the energy local supply of public interest to be installed or renovated and
the corresponding location
(b) can decide to implement transformation interventions where there are infrastructures for renewable energy production, recovery, transportation and distribution or where their construction is planned
3. Municipalities, in the framework of their legislative powers on urban planning
and construction activities, acknowledge the minimum qualifications for energy
performance set by the regional council and can decide not to put them in place
in case of the categories listed in art. 4 paragraph 3, directive 2002/91/CE.
4. Municipalities operate in order to:
(a) in case of new urbanization interventions on a surface bigger than 1.000 mq,
get the assessment of technical and economical feasibility for installing
renewable energy plants, cogeneration, heat pumps, centralised heating and
cooling systems;
(b) in case of newly constructed buildings with centralised heating systems,
requesting of putting in place systems for temperature control and heat
accounting for each habitation unit;
(c) in case of newly constructed public buildings or buildings used for public
scopes, respect the obligation of using renewable energies and adopt electronic control systems;
(d) in case of interventions according to art. 6 of the regional law n. 31 of 25th
November 2002 (General construction discipline) on existing buildings with
a surface bigger than 1.000 mq, improve their energy performance with the
aim of meeting the minimum qualifications described in art. 25, paragraph 1,
letter a) of this law and of creating the conditions to put in place systems for
heat accounting for each habitation unit.
Regional Energy Plan (PER)
PER was approved by the Resolution of the regional Assembly n. 141 of 14th
November 2007. The Plan complies with the general objectives of the energy policy
of the Regional Law n. 26/04 and with the Community and State fundamental principles. It set the objectives, the tools and the guidelines for the actions to be carried
out by Emilia-Romagna Region and the local authorities on its territory with regards
to:
– energy spare
– renewable energies promotion
– improvement of the territorial energy performances, especially as far as the
buildings, SMEs, mobility, distributed energy systems, agriculture and forest
sectors are concerned
– improvement of security, continuity and cheapness of internal delivery
6 UHI in the Metropolitan Cluster of Bologna-Modena...