451
Blom, M., Pearce, A., & Stuckey, P. 2016. A Decomposition-Based Algorithm for the Scheduling of
Open-Pit Networks Over Multiple Time Periods. Management Science, 62(10), 3059–3084.
Blom, M., Pearce, A., & Stuckey, P. 2017. Short-term scheduling of an open-pit mine with multiple
objectives. Engineering Optimization, 49(5), 777–795.
Blom, M., Pearce, A., & Stuckey, P. 2018. Short-term planning for open pit mines: a review. International Journal of Mining, Reclamation and Environment, 0930, 1–22.
Eivazy, H., & Askari-Nasab, H. 2012. A mixed integer linear programming model for short-term open
pit mine production scheduling. Mining Technology, 121(2), 97–108.
Fioroni, M.M., Franzese, L.A.G., Bianchi, T.J., Ezawa, L., Pinto, L.R., & de Miranda, G. 2008. Concurrent simulation and optimization models for mining planning. Pages 759–767 of: 2008 Winter
Simulation Conference.
Grodzevich, Oleg, & Romanko, Oleksandr. 2006. Normalization and Other Topics in Multi Objective
Optimization. Pages 89–101 of: Fields-MITACS Industrial Problems Workshop.
Huang, Z., Cai, W., & Banfield, A. 2009. A New Short-and Medium-Term Production Planning Tool -
Minesight Schedule Optimizer (MSSO). Pages 491–495 of: SME annual meeting & exhibit.
L’Heureux, G, Gamache, M, & Soumis, F. 2013. Mixed integer programming model for short term planning in open-pit mines. Mining Technology, 122(2), 101–109.
Matamoros, Martha E.Villalba, & Dimitrakopoulos, Roussos. 2016. Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions. European Journal of Operational Research, 255(3), 911–921.
Nehring, M., Knights, P.F., Kizil, M.S., & Hay, E. 2018. A comparison of strategic mine planning
approaches for in-pit crushing and conveying, and truck/shovel systems. International Journal of
Mining Science and Technology, 28(2).
Smith, Martin L. 1998. Optimizing short-term production schedules in surface mining: Integrating
mine modeling software with AMPL/CPLEX. International Journal of Surface Mining, Reclamation
and Environment, 12(4), 149–155.
Upadhyay, S.P., & Askari-Nasab, H. 2016. Truck-shovel allocation optimisation: a goal programming
approach. Mining Technology, 9009, 1–11.
Upadhyay, S.P., & Askari-Nasab, H. 2017. Dynamic shovel allocation approach to short-term production planning in open-pit mines. International Journal of Mining, Reclamation and Environment, 0(0),
1–20.
Upadhyay, S.P., & Askari-Nasab, H. 2018. Simulation and optimization approach for uncertainty-based
short-term planning in open pit mines. International Journal of Mining Science and Technology, 28(2),
153–166.
Blom, M., Pearce, A., & Stuckey, P. 2016. A Decomposition-Based Algorithm for the Scheduling of
Open-Pit Networks Over Multiple Time Periods. Management Science, 62(10), 3059–3084.
Blom, M., Pearce, A., & Stuckey, P. 2017. Short-term scheduling of an open-pit mine with multiple
objectives. Engineering Optimization, 49(5), 777–795.
Blom, M., Pearce, A., & Stuckey, P. 2018. Short-term planning for open pit mines: a review. International Journal of Mining, Reclamation and Environment, 0930, 1–22.
Eivazy, H., & Askari-Nasab, H. 2012. A mixed integer linear programming model for short-term open
pit mine production scheduling. Mining Technology, 121(2), 97–108.
Fioroni, M.M., Franzese, L.A.G., Bianchi, T.J., Ezawa, L., Pinto, L.R., & de Miranda, G. 2008. Concurrent simulation and optimization models for mining planning. Pages 759–767 of: 2008 Winter
Simulation Conference.
Grodzevich, Oleg, & Romanko, Oleksandr. 2006. Normalization and Other Topics in Multi Objective
Optimization. Pages 89–101 of: Fields-MITACS Industrial Problems Workshop.
Huang, Z., Cai, W., & Banfield, A. 2009. A New Short-and Medium-Term Production Planning Tool -
Minesight Schedule Optimizer (MSSO). Pages 491–495 of: SME annual meeting & exhibit.
L’Heureux, G, Gamache, M, & Soumis, F. 2013. Mixed integer programming model for short term planning in open-pit mines. Mining Technology, 122(2), 101–109.
Matamoros, Martha E.Villalba, & Dimitrakopoulos, Roussos. 2016. Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions. European Journal of Operational Research, 255(3), 911–921.
Nehring, M., Knights, P.F., Kizil, M.S., & Hay, E. 2018. A comparison of strategic mine planning
approaches for in-pit crushing and conveying, and truck/shovel systems. International Journal of
Mining Science and Technology, 28(2).
Smith, Martin L. 1998. Optimizing short-term production schedules in surface mining: Integrating
mine modeling software with AMPL/CPLEX. International Journal of Surface Mining, Reclamation
and Environment, 12(4), 149–155.
Upadhyay, S.P., & Askari-Nasab, H. 2016. Truck-shovel allocation optimisation: a goal programming
approach. Mining Technology, 9009, 1–11.
Upadhyay, S.P., & Askari-Nasab, H. 2017. Dynamic shovel allocation approach to short-term production planning in open-pit mines. International Journal of Mining, Reclamation and Environment, 0(0),
1–20.
Upadhyay, S.P., & Askari-Nasab, H. 2018. Simulation and optimization approach for uncertainty-based
short-term planning in open pit mines. International Journal of Mining Science and Technology, 28(2),
153–166.
