Appendix 7: Typical Factors Used in Capacity Factored Estimates
Type of plant
Factor (b)
Atmospheric and vacuum distillation
0.6
Catalytic reforming
0.6
Fluid cat cracking
0.7
Naphtha splitter
0.7
Thermal cracker
0.7
Delayed coking
0.6
Fluid coking
0.65
Gas compression – recip
0.9
Gas compression – centrif
0.75
Hydrogen plant
0.55
Sulfur production
0.55
Steam generation
0.55
Utilities (general)
0.55
All other type of plants including tankage and offsites generally may be taken as 0.6
Appendix 8: Background for Economic Calculations
The following summary provides the background necessary for most economic
calculations and should be used for reference as needed.
UNIT
P.S.-1
64,000
8
8
8
8
4
B/SD
B/SD
B/SD
B/SD
67,000
MAX
(1) Stop to be run on Nap/Go operations.
(2) Awaiting decision on Prem. Kerosene specification.
If Edeleanu plant runs at only 10,000 BU1/D the
Kero run on Ps-2 will be curtailed.
Rev. 1
NOTES.
55,000
8,000
P.S.-2
P.S.-3
HS-2
E.P.S.R.
(1)
(2)
THROUGHPUT
DAYS ON
STREAM
WED
11
THUR
12
9 FR-1086 ISSUE No. 2
SHIPPING
DEC 11 th “BR. ENGINEER”
(KUW)
306, 312
” 11 th “GUILDFORD”
(IRAQ)
309, 304, 303
” 11 th “WORLD GRANDEUR” (ARAM.) 301, 313, 303
” 13 th “SAN NICOLA”
(KUW)
307, 312
” 16 th “EXETER”
(KUW)
307, 311
” 16 th “CRYSANTNY ‘L’”
(ARAMCO 303, 304, 314
” 17 th “STEENSMOUNTAIN” (IRAN)
312
” 18 th “SAGUARO”
(BAS)
309
WEEKLY OPERATING PROGRAM.
FRI
13
SAT
14
SUN
15
MON
16
TUES
17
WED
18
KUWAIT
307
ARAMCO
ARAMCO
IRAQ
2482
GO
GO
G.O.
WS
2486
KERO
MDO
IRAN
NAP
SHUT DOWN
PREMIUM
2486
2482
KUW
IRAN
GO
GO
MDO
KERO
KERO
303
301
304
309
312
314
313
315
301
310
311
306
307
Fig. 17 A Typical Weekly Program
766
D.S.J. Jones and P.R. Pujado ´
Type of plant
Factor (b)
Atmospheric and vacuum distillation
0.6
Catalytic reforming
0.6
Fluid cat cracking
0.7
Naphtha splitter
0.7
Thermal cracker
0.7
Delayed coking
0.6
Fluid coking
0.65
Gas compression – recip
0.9
Gas compression – centrif
0.75
Hydrogen plant
0.55
Sulfur production
0.55
Steam generation
0.55
Utilities (general)
0.55
All other type of plants including tankage and offsites generally may be taken as 0.6
Appendix 8: Background for Economic Calculations
The following summary provides the background necessary for most economic
calculations and should be used for reference as needed.
UNIT
P.S.-1
64,000
8
8
8
8
4
B/SD
B/SD
B/SD
B/SD
67,000
MAX
(1) Stop to be run on Nap/Go operations.
(2) Awaiting decision on Prem. Kerosene specification.
If Edeleanu plant runs at only 10,000 BU1/D the
Kero run on Ps-2 will be curtailed.
Rev. 1
NOTES.
55,000
8,000
P.S.-2
P.S.-3
HS-2
E.P.S.R.
(1)
(2)
THROUGHPUT
DAYS ON
STREAM
WED
11
THUR
12
9 FR-1086 ISSUE No. 2
SHIPPING
DEC 11 th “BR. ENGINEER”
(KUW)
306, 312
” 11 th “GUILDFORD”
(IRAQ)
309, 304, 303
” 11 th “WORLD GRANDEUR” (ARAM.) 301, 313, 303
” 13 th “SAN NICOLA”
(KUW)
307, 312
” 16 th “EXETER”
(KUW)
307, 311
” 16 th “CRYSANTNY ‘L’”
(ARAMCO 303, 304, 314
” 17 th “STEENSMOUNTAIN” (IRAN)
312
” 18 th “SAGUARO”
(BAS)
309
WEEKLY OPERATING PROGRAM.
FRI
13
SAT
14
SUN
15
MON
16
TUES
17
WED
18
KUWAIT
307
ARAMCO
ARAMCO
IRAQ
2482
GO
GO
G.O.
WS
2486
KERO
MDO
IRAN
NAP
SHUT DOWN
PREMIUM
2486
2482
KUW
IRAN
GO
GO
MDO
KERO
KERO
303
301
304
309
312
314
313
315
301
310
311
306
307
Fig. 17 A Typical Weekly Program
766
D.S.J. Jones and P.R. Pujado ´