660
Y. Mizuno et al.
43.7 Summary
This study proposes a Japanese Power to Gas Concept and assumed feasibility of
that. The proposed concept is economically feasible under the specific situation. The
points of feasibility study are as follows:
1. Hydrogen from only “excess” electricity is too expensive even in the future, the
energy cost become higher than the present.
2. Intelligent control of electrolyzer will contribute to lowering the cost of hydrogen.
3. Hydrogen combined heat and power reduces more CO 2 than just supplying heat
from hydrogen, but it depends on CO 2 intensity of grid electricity.
Future analysis includes more sophisticated and realistic simulation of Power to
Gas system, such as using real electricity and heat demand pattern, analysis under
variable electricity price, and analyzing the effect of battery buffer for electrolyzer.
Acknowledgements The content of this paper is based on the project supported by Aomori
Prefecture and Rokkasho Village.
References
Agency for Natural Resources and Energy (2011), Power saving action plan format for Schools (in
Japanese)
Agency for Natural Resources and Energy, renewable energy business plan authorization information, https://www.fit-portal.go.jp/PublicInfo (in Japanese, visited June, 2019)
Agency of Natural Resources and Energy, petroleum product price survey | various statistical
information, https://www.enecho.meti.go.jp/statistics/petroleum_and_lpgas/pl007/ (in Japanese,
visited June, 2019)
Aomori Prefecture (March 2016) welcome to mutsu-ogawara industrial park (in Japanese)
Chubu Gas Corp (2005) The outline of balance sheet FY 2004 December Period (in Japanese)
Engineering Promotion Association, Underground Development Research Center (2017) FY 2006
Study on realization of hydrogen energy supply and utilization system toward vitalization of local
businesses, ENAA GEC 2006-P3 (in Japanese)
European Powertogas, Power to Gas European Powertogas, https://europeanpowertogas.com/
power-to-gas/, (visited June, 2019)
Gahleitner G (2013) Hydrogen from renewable electricity: an international review of power-to-gas
pilot plants for stationary applications. Int J Hydrogen Energy 38:2039–2061
Gotz M, Lefebvre J, Mors F, Koch M, Graf F, Bajohr S, Remert R, Kolb T (2016) Renewable
power-to-gas: a technological and economic review. Renew Energy 85:1371–1390
Hashigaki K, “Sports Club Aqua” Hybrid hot water supply and heat storage system introduction
case, Heatpump and its application 2010.9. No.80:28–30 (in Japanese)
International Energy Agency (2016) World energy outlook 2016, IEA publications
Kiyota N, Murakara S, Nishina D, Ogawa K, Kakimoto S (2002) A study on the thermal environment
and energy consumption of the kitchen in the center of providing school lunch Part 1. The
measurement outline of the all electrical kitchen and the results of measurement in middle season
In: Proceedings of symposium of society of heating, air-conditioning sanitary engineers of Japan,
Fukuoka, 11–12 September 2010 (in Japanese)
Y. Mizuno et al.
43.7 Summary
This study proposes a Japanese Power to Gas Concept and assumed feasibility of
that. The proposed concept is economically feasible under the specific situation. The
points of feasibility study are as follows:
1. Hydrogen from only “excess” electricity is too expensive even in the future, the
energy cost become higher than the present.
2. Intelligent control of electrolyzer will contribute to lowering the cost of hydrogen.
3. Hydrogen combined heat and power reduces more CO 2 than just supplying heat
from hydrogen, but it depends on CO 2 intensity of grid electricity.
Future analysis includes more sophisticated and realistic simulation of Power to
Gas system, such as using real electricity and heat demand pattern, analysis under
variable electricity price, and analyzing the effect of battery buffer for electrolyzer.
Acknowledgements The content of this paper is based on the project supported by Aomori
Prefecture and Rokkasho Village.
References
Agency for Natural Resources and Energy (2011), Power saving action plan format for Schools (in
Japanese)
Agency for Natural Resources and Energy, renewable energy business plan authorization information, https://www.fit-portal.go.jp/PublicInfo (in Japanese, visited June, 2019)
Agency of Natural Resources and Energy, petroleum product price survey | various statistical
information, https://www.enecho.meti.go.jp/statistics/petroleum_and_lpgas/pl007/ (in Japanese,
visited June, 2019)
Aomori Prefecture (March 2016) welcome to mutsu-ogawara industrial park (in Japanese)
Chubu Gas Corp (2005) The outline of balance sheet FY 2004 December Period (in Japanese)
Engineering Promotion Association, Underground Development Research Center (2017) FY 2006
Study on realization of hydrogen energy supply and utilization system toward vitalization of local
businesses, ENAA GEC 2006-P3 (in Japanese)
European Powertogas, Power to Gas European Powertogas, https://europeanpowertogas.com/
power-to-gas/, (visited June, 2019)
Gahleitner G (2013) Hydrogen from renewable electricity: an international review of power-to-gas
pilot plants for stationary applications. Int J Hydrogen Energy 38:2039–2061
Gotz M, Lefebvre J, Mors F, Koch M, Graf F, Bajohr S, Remert R, Kolb T (2016) Renewable
power-to-gas: a technological and economic review. Renew Energy 85:1371–1390
Hashigaki K, “Sports Club Aqua” Hybrid hot water supply and heat storage system introduction
case, Heatpump and its application 2010.9. No.80:28–30 (in Japanese)
International Energy Agency (2016) World energy outlook 2016, IEA publications
Kiyota N, Murakara S, Nishina D, Ogawa K, Kakimoto S (2002) A study on the thermal environment
and energy consumption of the kitchen in the center of providing school lunch Part 1. The
measurement outline of the all electrical kitchen and the results of measurement in middle season
In: Proceedings of symposium of society of heating, air-conditioning sanitary engineers of Japan,
Fukuoka, 11–12 September 2010 (in Japanese)
