Offices
Hospital
Schools
Leisure and recreational areas
Town hall and ministry offices
University
Hotels and casinos
Sports facilities – stadium, gym, swimming pools
Religious places
Water supply
Sizing of main pipeline
Sizing of Water towers and Distribution of water
Design of main pipe
Location of Water Treatment Plant
Sewerage
Waste loads from the different buildings
Type of disposal – sewer line to Wastewater Treatment Plant (WWTP)
Design of main pipe
Location of Wastewater Treatment Plant (WWTP)
Energy requirements
Total energy consumed – domestic and commercial – for 100,000 people.
Sources of energy
Means of collecting energy
Amount of energy that can be collected and saved through the various sources.
Preliminary sizing of some foundations
Calculation of loading from slab and beam to column
Sizing of some foundations – pad footing and raft foundation
Housing Policies
Future Development
Providing shelter for a population growth of 500,000 people
As mentioned earlier, the issue of land planning and transport will first be
discussed.
3.4.3 Transport and Land Use
3.4.3.1 Limiting Traffic Flow
One of the objectives of this proposal is to minimize traffic problems within the
town. A means of doing so is to construct high-rise buildings with commercial
centres and offices within the same building or within walking distance to another
3.4 Smart and Sustainable Cities
85
Hospital
Schools
Leisure and recreational areas
Town hall and ministry offices
University
Hotels and casinos
Sports facilities – stadium, gym, swimming pools
Religious places
Water supply
Sizing of main pipeline
Sizing of Water towers and Distribution of water
Design of main pipe
Location of Water Treatment Plant
Sewerage
Waste loads from the different buildings
Type of disposal – sewer line to Wastewater Treatment Plant (WWTP)
Design of main pipe
Location of Wastewater Treatment Plant (WWTP)
Energy requirements
Total energy consumed – domestic and commercial – for 100,000 people.
Sources of energy
Means of collecting energy
Amount of energy that can be collected and saved through the various sources.
Preliminary sizing of some foundations
Calculation of loading from slab and beam to column
Sizing of some foundations – pad footing and raft foundation
Housing Policies
Future Development
Providing shelter for a population growth of 500,000 people
As mentioned earlier, the issue of land planning and transport will first be
discussed.
3.4.3 Transport and Land Use
3.4.3.1 Limiting Traffic Flow
One of the objectives of this proposal is to minimize traffic problems within the
town. A means of doing so is to construct high-rise buildings with commercial
centres and offices within the same building or within walking distance to another
3.4 Smart and Sustainable Cities
85