Installation of a Brown Field Slag Reduction Furnace: State …
199
Process Results
The plant was commissioned in summer 2018, and FAC was received still in 2019.
The Kuettner design features together with the LUEHR off-gas filter proved to
operate as designed.
Compared to traditional SBF installations, the Kuettner SBF off-gas treatment
concept provided a strong improvement in terms of safe and accretion-free operation
of the boiler inlet and top.
The key achievements were as follows:
– Stable operation with respective design throughput
– Full post-combustion and safe operation
– No accretion formation of sticky dust in the boiler top
– The required low emission level criteria were achieved without the need for wet
scrubbers.
199
Process Results
The plant was commissioned in summer 2018, and FAC was received still in 2019.
The Kuettner design features together with the LUEHR off-gas filter proved to
operate as designed.
Compared to traditional SBF installations, the Kuettner SBF off-gas treatment
concept provided a strong improvement in terms of safe and accretion-free operation
of the boiler inlet and top.
The key achievements were as follows:
– Stable operation with respective design throughput
– Full post-combustion and safe operation
– No accretion formation of sticky dust in the boiler top
– The required low emission level criteria were achieved without the need for wet
scrubbers.