IV. Water consumption of solidifying workshop
The process water consumption in the solidifying workshop is 4.1 m
3 /d, or
1353 m
3 /a as calculated based on 330 days. The process water in the solidifying
workshop comes from the percolate treatment plant.
V. Domestic sewage
The domestic sewage discharge is 950.4 m
3 /a (2.88 m
3 /d) as calculated based on
0.1 m
3
/person day of domestic water consumption and 20% of loss rate. The newly
produced domestic sewage in the hazardous waste landfill, after pretreated by the
septic tank, is conveyed to the secondary sewage treatment works in the new area
for centralized treatment.
The output and discharge of wastewater pollution sources are listed in
Table 5.122.
Table 5.120 Discharge of the flushing water of the solidifying workshop
Classification
Water
consumption
quota
Daily water
consumption
(m
3
/d)
Water
discharge
(m
3
/d)
Remarks
Flushing water of
solidifying
workshop
3 L/m
2 d
2.63
2.37
878 m
2 in total, once
a day, for a duration
of 1 h
Note The annual amount is calculated based on 330 days/a
Table 5.121 Discharge of other flushing wastewaters and laboratory wastewater
Classification
Water
consumption
quota
Daily water
consumption
(m
3
/d)
Water
discharge
(m
3
/d)
Remarks
Flushing water of
tentative storage
room
3 L/m
2 d
0.60
0.54
200 m
2 in total
Flushing water of
containers
50 L/
container
0.25
0.23
5 per day in total
Laboratory water
2.7
2.7
Flushing water of
turnaround site
3 L/m
2 d
2.70
2.43
900 m
2 in total, once
a day, for a duration
of 1 h
Vehicle flushing
water
150 L/
vehicle d
1.05
0.95
Flushed once a day,
for 7 transport
vehicles in total
Total
7.3
6.85
Note The annual yield of the production wastewater is calculated based on 330 days/a
362
5 Application Cases
The process water consumption in the solidifying workshop is 4.1 m
3 /d, or
1353 m
3 /a as calculated based on 330 days. The process water in the solidifying
workshop comes from the percolate treatment plant.
V. Domestic sewage
The domestic sewage discharge is 950.4 m
3 /a (2.88 m
3 /d) as calculated based on
0.1 m
3
/person day of domestic water consumption and 20% of loss rate. The newly
produced domestic sewage in the hazardous waste landfill, after pretreated by the
septic tank, is conveyed to the secondary sewage treatment works in the new area
for centralized treatment.
The output and discharge of wastewater pollution sources are listed in
Table 5.122.
Table 5.120 Discharge of the flushing water of the solidifying workshop
Classification
Water
consumption
quota
Daily water
consumption
(m
3
/d)
Water
discharge
(m
3
/d)
Remarks
Flushing water of
solidifying
workshop
3 L/m
2 d
2.63
2.37
878 m
2 in total, once
a day, for a duration
of 1 h
Note The annual amount is calculated based on 330 days/a
Table 5.121 Discharge of other flushing wastewaters and laboratory wastewater
Classification
Water
consumption
quota
Daily water
consumption
(m
3
/d)
Water
discharge
(m
3
/d)
Remarks
Flushing water of
tentative storage
room
3 L/m
2 d
0.60
0.54
200 m
2 in total
Flushing water of
containers
50 L/
container
0.25
0.23
5 per day in total
Laboratory water
2.7
2.7
Flushing water of
turnaround site
3 L/m
2 d
2.70
2.43
900 m
2 in total, once
a day, for a duration
of 1 h
Vehicle flushing
water
150 L/
vehicle d
1.05
0.95
Flushed once a day,
for 7 transport
vehicles in total
Total
7.3
6.85
Note The annual yield of the production wastewater is calculated based on 330 days/a
362
5 Application Cases