76
- The operational energy of water's distribution (energy consumed during pumping and
water transfer).
Although the wilaya of Algiers' statistics do not describe the material that constitutes the pipe
of the water distribution network, the EF of the embodied energy was calculated, assuming
that this material is HDPE (lower emission factor).
The operational energy for water production and the transfer was provided by the
SEEAL/Tipaza for the year 2020 (production = 11.4 GWh, transfer = 22.5 KWh) for more than
20 million m
3
(produced) and 34 million (transferred). This data was included to model the
energy consumed for one m
3
of drinking water and define the equivalent EF_c.
The EF of the built area is associated with the area occupied by water capture infrastructures,
i.e., artificial water dams, including the Koudiate Acerdounedam in Algiers and the Meurad
dam in Tipaza. The calculation results of the EF_c and EF_built are described in the table 26
and figures 8 and 9.
Table 26. Ecological footprint of the water production sector in Algiers and Tipaza wilayas
Component
Category
Data
Unit
Emissions
(tCO2eq)
Ecological Footprint
(gha)
Algiers Tipaza
Algiers Tipaza
Algiers
Tipaza
Material
1.2
48.2
m
3
Operational Energy
Production
[-]
0.57 kWh/m
3
[-] 10 422.5
[-]
3 468.8
Transfer
[-]
0.66
[-]
8 550.2
[-]
2 845.7
Embodied Energy
Pipeline
4510
100
km 6683.8
1 480.2
2 224.5
49.3
Total Energy
6683.8 19120.9
2 224.5
6 363.8
Built land
ND
ND
km²
Figure 8. Operational and embodied energy's share in total EF of both wilayas
0
2000
4000
6000
8000
EF_Oprt_Eng
EF_Emb_Eng
EF_c
ECOLOGICAL FOOTPRINT (GHA)
Algiers
Tipaza
Précédent

Algerian coastal and marine ecological footprint assessment: feasibility and constraints - 76/158

Suivant