188
G. Vora et al.
Fig. 3 Rusted metal bars
Fig. 4 Finished pipes
engineers was variance in machining quality when done by different workers, as no
specific machines are assigned to workers.
Due to the lack of workplace management, it is obvious that for scrap too, there
was no specific place assigned. Figure 6 shows how it is generally kept adjacent to
the walls such that it remains out of the path. Due to the heat of the moment, the
scrap is not sent to a section, and later, it starts getting accumulated. After some time,
someone must take the initiative once a month to discard or place it properly on the
factory premises.
After a product is made, most of the time, due to lack of infrastructure, quality
testing is not possible. So, the product is dispatched, assembled at the client’s location,
and then, a trial run is done. Due to lack of this quality control, many times, the
machines are returned for minor modifications. This adds to the shipping charges,
along with scratching the company’s name.
G. Vora et al.
Fig. 3 Rusted metal bars
Fig. 4 Finished pipes
engineers was variance in machining quality when done by different workers, as no
specific machines are assigned to workers.
Due to the lack of workplace management, it is obvious that for scrap too, there
was no specific place assigned. Figure 6 shows how it is generally kept adjacent to
the walls such that it remains out of the path. Due to the heat of the moment, the
scrap is not sent to a section, and later, it starts getting accumulated. After some time,
someone must take the initiative once a month to discard or place it properly on the
factory premises.
After a product is made, most of the time, due to lack of infrastructure, quality
testing is not possible. So, the product is dispatched, assembled at the client’s location,
and then, a trial run is done. Due to lack of this quality control, many times, the
machines are returned for minor modifications. This adds to the shipping charges,
along with scratching the company’s name.