15 Drought and Insolvency: Case Study of the Producer-Buyer …
493
Fig. 15.5 Izvorul Muntelui Reservoir, built in 1961 on the Bistrita River, the third largest in Romania
(after the Iron Gates I and Stanca-Costesti)
Fig. 15.6 Vidra Reservoir, which supplies the Ciunget Hydropower Plant on the Lotru River
493
Fig. 15.5 Izvorul Muntelui Reservoir, built in 1961 on the Bistrita River, the third largest in Romania
(after the Iron Gates I and Stanca-Costesti)
Fig. 15.6 Vidra Reservoir, which supplies the Ciunget Hydropower Plant on the Lotru River
