6 Drinking Water Supply Systems—Evolution Towards Efficiency
215
Fig. 6.11 Searching for the “best” water pipe material with AMEL1 software
sense” and may be a valuable tool for any decision maker. Several scenarios can be
run, allowing the decider to better understand his alternatives.
It could be stated that in this particular case there is no miracle material, i.e. there
is no absolute winner for any situation. Ductile cast iron won by a very small margin.
Several future scenarios may be taken into account, by slightly reconsidering some
grades or some weights in the performance matrix.
6.6 Steps to the Future
For the further development of the water sector in the Cluj-S˘ alaj region, long-term
investment programs have been promoted, in order to provide the population with
adequate water and wastewater services, at the required quality and at affordable
rates.
The Operational Program for Large Infrastructure (POIM) was elaborated to meet
Romania’s needs for development identified in the 2014–2020 Partnership Agreement and in full compliance with the Common Strategic Framework and the Position Document of the European Commission’s services. Within the list of predefined
projects to be financed by POIM (Priority Axis 3, Specific Objective 3.2) we found
215
Fig. 6.11 Searching for the “best” water pipe material with AMEL1 software
sense” and may be a valuable tool for any decision maker. Several scenarios can be
run, allowing the decider to better understand his alternatives.
It could be stated that in this particular case there is no miracle material, i.e. there
is no absolute winner for any situation. Ductile cast iron won by a very small margin.
Several future scenarios may be taken into account, by slightly reconsidering some
grades or some weights in the performance matrix.
6.6 Steps to the Future
For the further development of the water sector in the Cluj-S˘ alaj region, long-term
investment programs have been promoted, in order to provide the population with
adequate water and wastewater services, at the required quality and at affordable
rates.
The Operational Program for Large Infrastructure (POIM) was elaborated to meet
Romania’s needs for development identified in the 2014–2020 Partnership Agreement and in full compliance with the Common Strategic Framework and the Position Document of the European Commission’s services. Within the list of predefined
projects to be financed by POIM (Priority Axis 3, Specific Objective 3.2) we found