76
Coastal Engineering: Theory and Practice
for November and December are shown in Figs. 3.23(a) and 3.23(b),
respect ively.
The sédiment transport across the surf width for every 3 hours is
summed up and plotted along with the sédiment transport arrived from
CERC formula in Fig. 3.24(a) and the same has been projected during
Fig. 3.23(a) Distribution of alongshore current velocity and sédiment transport
across surf zone for November.
Précédent

- 91/362

Suivant