410
12 Integration and Assembly Technology of Lunar Lander
test, when to conduct special tests and what was the constraints of special tests,
whether available AIT facilities and resources could satisfy requirements of system
integration and assembly of the lunar lander.
(2) Based on technical requirements of the Chang’E-3 project, the compatibility
of available technological approaches with process methods was analyzed. In the
design of system integration and assembly, the process technology research should
be analyzed, as well as necessary special process parameters and process methods,
for the department of process technology to verify and qualify the process technology
in advance.
(3) Based on technical requirements of the Chang’E-3 project, the planning of
manufacture mode of system integration and assembly was analyzed. For the requirements for development of the lunar lander, several prototypes of the lunar lander
were planned to be developed in parallel in phase B. The requirements of facility
resource, process equipment resource and human resource were analyzed to help
the management departments to organize manufacture and support conditions in
advance;
(4) The development of technological equipment for system integration and
assembly should be analyzed. According to manufacture management mode, a
preliminary analysis of technological equipment development matrix for system
integration and assembly was conducted, including newly developed equipment, old
equipment to be used, borrowed, or modified. So, the manufacture management
department could understand in advance the scale of manufacture of the technological equipment and the cost, so as to coordinate and organize the corresponding
resources.
(5) Quality assurance measures and requirements for technological equipment
development of system integration and assembly should be analyzed. According to
the technical characteristics and manufacture management of the lunar lander, the
quality assurance, process review plan and quality control forms should be established in advance, so that the quality assurance department could plan and prepare
quality assurance and control in advance.
(6) Identification and requirements of risk in manufacture process should be
analyzed. The safety control requirements for special transport, lifting, transportation and radioisotope equipment of the lunar lander were proposed. It could help
the safety management department to conduct manufacture safety assurance and
preparation in advance.
12.4.2 Planning of Technological Equipment
The planning of technological equipment was to analyze and evaluate the preliminary
support conditions of technological equipment in design of system integration and
assembly. Based on the system integration technology and technical procedure of
the lunar lander developed in serial and parallel, requirements for technological
equipment should be analyzed and evaluated, so as to ensure that the development
12 Integration and Assembly Technology of Lunar Lander
test, when to conduct special tests and what was the constraints of special tests,
whether available AIT facilities and resources could satisfy requirements of system
integration and assembly of the lunar lander.
(2) Based on technical requirements of the Chang’E-3 project, the compatibility
of available technological approaches with process methods was analyzed. In the
design of system integration and assembly, the process technology research should
be analyzed, as well as necessary special process parameters and process methods,
for the department of process technology to verify and qualify the process technology
in advance.
(3) Based on technical requirements of the Chang’E-3 project, the planning of
manufacture mode of system integration and assembly was analyzed. For the requirements for development of the lunar lander, several prototypes of the lunar lander
were planned to be developed in parallel in phase B. The requirements of facility
resource, process equipment resource and human resource were analyzed to help
the management departments to organize manufacture and support conditions in
advance;
(4) The development of technological equipment for system integration and
assembly should be analyzed. According to manufacture management mode, a
preliminary analysis of technological equipment development matrix for system
integration and assembly was conducted, including newly developed equipment, old
equipment to be used, borrowed, or modified. So, the manufacture management
department could understand in advance the scale of manufacture of the technological equipment and the cost, so as to coordinate and organize the corresponding
resources.
(5) Quality assurance measures and requirements for technological equipment
development of system integration and assembly should be analyzed. According to
the technical characteristics and manufacture management of the lunar lander, the
quality assurance, process review plan and quality control forms should be established in advance, so that the quality assurance department could plan and prepare
quality assurance and control in advance.
(6) Identification and requirements of risk in manufacture process should be
analyzed. The safety control requirements for special transport, lifting, transportation and radioisotope equipment of the lunar lander were proposed. It could help
the safety management department to conduct manufacture safety assurance and
preparation in advance.
12.4.2 Planning of Technological Equipment
The planning of technological equipment was to analyze and evaluate the preliminary
support conditions of technological equipment in design of system integration and
assembly. Based on the system integration technology and technical procedure of
the lunar lander developed in serial and parallel, requirements for technological
equipment should be analyzed and evaluated, so as to ensure that the development