Project activities
Environmental impact
Mitigation measures
Vehicular movement and DG sets
Emission of SO
2 , NO
2 ,
SPM
The power to project site is supplied by a state grid. In the case of backup,
DG sets will be used, which will be provided by appropriate pollution control
measures such as stacks of adequate height
3. Noise environment
Operation of pumps and Jack well, vehicular
movement
To the locals in the vicinity Acoustic enclosures will be provided for the pumps operating in the Jack well
Regular check-up and maintenance of the operating equipment and machines
will be done
Planting noise attenuating species to reduce noise pollution shall be carried
out
4. Socio-economic environment
Implementation of drinking water scheme
Health status of the people Project authority will have a discussion with PHCs in the area, so that water
borne diseases shall be avoided
3.6 Public Participation