410
Akaike, A. & Dagdelen, K.A. 1999. Strategic Production Scheduling Method for an Open Pit Mine,
Proc. 28th Symp. Application Computers and Operation Research in the Mineral Industry.
Alipour, A. Khodaiari, A.A. Jafari, A. & Tavakkoli Moghaddam, R. 2017. A genetic algorithm approach
for open-pit mine production scheduling. International Journal of Mining and Geo-Engineering 51(1):
47–52.
Askari-Nasab, H. Pourrahimian, Y. Ben-Awuah, E. & Kalantari, S. 2011. Mixed Integer Linear Programming Formulations for Open Pit Production Scheduling, J. Min.Sci 47.
Bienstock, D. & Zuckerberg, M. 2009. A New Algorithm for Precedence Constrained Production Scheduling: Optimization Online.
Bley, A. Boland, N. Fricke, C. & Froyland, G. 2010. A Strengthened Formulation and Cutting Planes for
the Open Pit Mine Production Scheduling Problem, Computer Operation Research 37.
Blom, C. Pearce, A.R. & Stuckey, P.J. 2018. Short-Term Planning for Open Pit Mines, A Review, International Journal of Mining Reclamation and Environment: Published online, DOI: 10. 1080/17480930.
Boland, N. Dumitrescu, I. Froyland, G. & Gleixner, A.M. 2009. LP-Based Disaggregation Approaches
to Solving the Open Pit Mining Production Scheduling Problem with Block Processing Selectivity.
Computer Operation Research 36.
Boland, N. Fricke, C. & Froyland, G. 2007. A Strengthened Formulation and Cutting Planes for the
Open Pit Mine Production Scheduling Problem. Computers and Operations Research 37.
Boucher, A. & Dimitrakopoulos, R. 2012. Multivariate Block-Support Simulation of the Yandi Iron
Ore Deposit. Mathematical Geosciences 44.
Caccetta, L. 1998. Open Pit Mine Production Scheduling. 3rd Regional Proceeding of Application Computers and Operation Research in the Mineral Industry.
Caccetta, L. & Hill, S.P. 2003. An Application of Branch and Cut to Open Pit Mine Scheduling. Journal
Global Optimization 27.
Chai, T. Ding, J. & Wu, F. 2011. Hybrid intelligent control for optimal operation of shaft furnace roasting process. Control Engineering Practice 19 (3): 264–275.
Dagdelen, K. & Johnson, T.B. 1986. Optimum Open Pit Mine Production Scheduling by Lagrangian
Parameterization, Proc. 19th Symp. Application Computers and Operation Research in the Mineral
Industry.
Dagdelen, K. 2000. Open pit optimization—Strategies for improving economics of mining projects
through mine planning. Application Computers for Mining Industry: 125–1.29.
Denby, B. & Schofield, D. 1995. The Use of Genetic Algorithms in Underground Mine Scheduling,
Proc. 25th Symp. Application Computers and Mathematics in the Mineral Industry.
Denby, B. Schofield, D. & Surme, T. 1998. Genetic Algorithm for Flexible Scheduling of Open Pit
Operations, Proc. 27th Int. Symp. Application Computers and Mathematics in the Mineral Industry.
Ding, W.T. Zhang, G.C. & Liu, J.J. 2013. 3’ Truncation of the GPD1 promoter in Saccharomyces cerevisiae for improved ethanol yield and productivity. Appl Environ Microbiol 79(10): 3273–81.
Dowd, P.A. & Onur, A.H. 1992. Optimizing Open Pit Design and Sequencing, Proc. 23rd Symp. Application Computers and Operation Research in the Mineral Industry.
Elevli, B. 1995. Open Pit Mine Design and Extraction Sequencing by Use of OR and AI Concept. International Journal Surface Mining Reclamation Environment 9.
Espinoza, D. Goycoolea, M. Moreno, E. & Newman, A. 2013. MineLib. A Library of Open Pit Mining
Problems. Annals of Operations Research 206.
Gershon, M.E. 1983. Optimal Mine Production Scheduling, Evaluation of Large Scale Mathematical
Programming Approaches. International Journal of Mining Engineering 1.
Gleixner, A. 2008. Solving Large-Scale Open Pit Mining Production Scheduling Problems by Integer
Programming, Master’s Thesis: Technische Universität Berlin.
Graves, S.C. 1981. Multistage Lot—Sizing. An Iterative Procedure. Technical Report No. 164, Operations Reserch Center, Massachusetts Institue of Technology. 1979. (To appear in TIMS Studies in
Management Science, Multi—Level Productions/Inventory Systems. Teory & Practice, Edited by
L.B. Schwarz).
Herrmann, G. Kais, S. Hoffbauer, J. Shah-Hosseini, K. Brüggenolte, N. Schober, H. Fäsi, M. & Schär,
P. 2007. Journal Article|Research Support. Non-U.S. Gov’t: LIF1, SPP382. DNL4, NEJ1, PXR1.
Ibrahimov, M. Mohais, A. Schellenberg, S. & Michalewicz, Z. 2014. Scheduling in Iron Ore Open-Pit
Mining, The Int. J. Advanced Manufacturing Technology 72.
Khan, A. & Niemann-Delius, C. 2014. Production Scheduling of Open Pit Mines Using Particle Swarm
Optimization Algorithm. Advances in Operations Research.
Khan, A. 2018. Long-term production scheduling of open pit mines using particle swarm and bat
algorithms under grade uncertainty. The Southern African Institute of Mining and Metallurgy 118:
361–368.
Précédent

- 431/780

Suivant