385
Ahmadi-Javid, A. & Hooshangi-Tabrizi, P., 2017. Integrating employee timetabling with scheduling of
machines and transporters in a job-shop environment: A mathematical formulation and an anarchic
society optimization algorithm. Computers & Operations Research 84: 73–91.
Artigues, C., Gendreau, M. & Rousseau, L.M., 2006. A flexible model and a hybrid exact method for
integrated employee timetabling and production scheduling. In International Conference on the Practice and Theory of Automated Timetabling (pp. 67–84). Berlin, Heidelberg: Springer.
Artigues, C., Gendreau, M., Rousseau, L.M. & Vergnaud, A., 2009. Solving an integrated employee
timetabling and job-shop scheduling problem via hybrid branch-and-bound. Computers &
Operations Research 36(8): 2330–2340.
Benavides, A.J., Ritt, M. & Miralles, C., 2014. Flow shop scheduling with heterogeneous workers. European Journal of Operational Research 237(2): 713–720.
Campos Ciro, G., Dugardin, F., Yalaoui, F. & Kelly, R., 2016. Open shop scheduling problem with a
multi-skills resource constraint: A genetic algorithm and an ant colony optimisation approach. International Journal of Production Research 54(16): 4854–4881.
Daniels, R.L. & Mazzola, J.B., 1994. Flow shop scheduling with resource flexibility. Operations Research
42(3): 504–522.
Daniels, R.L., Mazzola, J.B. & Shi, D., 2004. Flow shop scheduling with partial resource flexibility.
Management Science 50(5): 658–669.
Frihat, M., Sadfi, C. & Hadj-Alouane, A.B., 2014. Optimization of integrated employee timetabling
and hybrid job shop scheduling under time lag constraints. In International Conference on Control,
Decision and Information Technologies (CoDIT), (pp. 282–287). IEEE.
Guyon, O., Lemaire, P., Pinson, E. & Rivreau, D., 2014. Solving an integrated job-shop problem with
human resource constraints. Annals of Operations Research 213(1): 147–171.
Huq, F., Cutright, K. & Martin, C., 2004. Employee scheduling and makespan minimization in a flow
shop with multi-processor work stations: a case study. Omega 32(2): 121–129.
Mencia, C., Sierra, M.R. & Varela, R., 2013. An efficient hybrid search algorithm for job shop scheduling with operators. International Journal of Production Research 51(17): 5221–5237.
Puttkammer, K., Kleber, R., Schulz, T. & Inderfurth, K., 2011. Simultane Maschinenbelegungs- und
Personaleinsatzplanung in KMUs anhand eines Fallbeispiels aus der Druckereibranche. In Sucky,
E., Asdecker, B., Dobhan, A., Haas, S. & Wiese, J. (eds), Logistikmanagement: Herausforderungen,
Chancen und Lösungen: 229–247. University of Bamberg Press.
Ramya, G. & Chandrasekaran, M., 2014. Shuffled frog leaping algorithm approach to employee timetabling and job shop scheduling. International Journal of Internet Manufacturing and Services 4 & 25
3(3): 178–203.
Santos, F., Fukasawa, R. & Ricardez-Sandoval, L., 2018. An integrated personnel allocation and
machine scheduling problem for industrial size multipurpose plants. IFAC-PapersOnLine 51(18):
156–161.
Schulze, M., 2016. Ein hierarchischer Ansatz zur Lösung von Ablaufplanungsproblemen im Bergbau:
Darstellung am Beispiel des Örterbaus. Aachen: Shaker.
Schulze, M., Mathiak, T. & Haney, C., 2017. Using operations research techniques to increase efficiency
in German potash mining. In Application of Computers and Operations Research in the Mineral Industry; Proc. intern. symp., Golden, Colorado, 2017 5: 9–15.
Schulze, M., Rieck, J., Seifi & C., Zimmermann, J., 2016. Machine scheduling in underground mining:
An application in the potash industry. OR Spectrum 38(2): 365–403.
Schulze, M., Zimmermann, J., 2017. Staff and machine shift scheduling in a German potash mine.
Journal of Scheduling 20(6): 635–656.
Ahmadi-Javid, A. & Hooshangi-Tabrizi, P., 2017. Integrating employee timetabling with scheduling of
machines and transporters in a job-shop environment: A mathematical formulation and an anarchic
society optimization algorithm. Computers & Operations Research 84: 73–91.
Artigues, C., Gendreau, M. & Rousseau, L.M., 2006. A flexible model and a hybrid exact method for
integrated employee timetabling and production scheduling. In International Conference on the Practice and Theory of Automated Timetabling (pp. 67–84). Berlin, Heidelberg: Springer.
Artigues, C., Gendreau, M., Rousseau, L.M. & Vergnaud, A., 2009. Solving an integrated employee
timetabling and job-shop scheduling problem via hybrid branch-and-bound. Computers &
Operations Research 36(8): 2330–2340.
Benavides, A.J., Ritt, M. & Miralles, C., 2014. Flow shop scheduling with heterogeneous workers. European Journal of Operational Research 237(2): 713–720.
Campos Ciro, G., Dugardin, F., Yalaoui, F. & Kelly, R., 2016. Open shop scheduling problem with a
multi-skills resource constraint: A genetic algorithm and an ant colony optimisation approach. International Journal of Production Research 54(16): 4854–4881.
Daniels, R.L. & Mazzola, J.B., 1994. Flow shop scheduling with resource flexibility. Operations Research
42(3): 504–522.
Daniels, R.L., Mazzola, J.B. & Shi, D., 2004. Flow shop scheduling with partial resource flexibility.
Management Science 50(5): 658–669.
Frihat, M., Sadfi, C. & Hadj-Alouane, A.B., 2014. Optimization of integrated employee timetabling
and hybrid job shop scheduling under time lag constraints. In International Conference on Control,
Decision and Information Technologies (CoDIT), (pp. 282–287). IEEE.
Guyon, O., Lemaire, P., Pinson, E. & Rivreau, D., 2014. Solving an integrated job-shop problem with
human resource constraints. Annals of Operations Research 213(1): 147–171.
Huq, F., Cutright, K. & Martin, C., 2004. Employee scheduling and makespan minimization in a flow
shop with multi-processor work stations: a case study. Omega 32(2): 121–129.
Mencia, C., Sierra, M.R. & Varela, R., 2013. An efficient hybrid search algorithm for job shop scheduling with operators. International Journal of Production Research 51(17): 5221–5237.
Puttkammer, K., Kleber, R., Schulz, T. & Inderfurth, K., 2011. Simultane Maschinenbelegungs- und
Personaleinsatzplanung in KMUs anhand eines Fallbeispiels aus der Druckereibranche. In Sucky,
E., Asdecker, B., Dobhan, A., Haas, S. & Wiese, J. (eds), Logistikmanagement: Herausforderungen,
Chancen und Lösungen: 229–247. University of Bamberg Press.
Ramya, G. & Chandrasekaran, M., 2014. Shuffled frog leaping algorithm approach to employee timetabling and job shop scheduling. International Journal of Internet Manufacturing and Services 4 & 25
3(3): 178–203.
Santos, F., Fukasawa, R. & Ricardez-Sandoval, L., 2018. An integrated personnel allocation and
machine scheduling problem for industrial size multipurpose plants. IFAC-PapersOnLine 51(18):
156–161.
Schulze, M., 2016. Ein hierarchischer Ansatz zur Lösung von Ablaufplanungsproblemen im Bergbau:
Darstellung am Beispiel des Örterbaus. Aachen: Shaker.
Schulze, M., Mathiak, T. & Haney, C., 2017. Using operations research techniques to increase efficiency
in German potash mining. In Application of Computers and Operations Research in the Mineral Industry; Proc. intern. symp., Golden, Colorado, 2017 5: 9–15.
Schulze, M., Rieck, J., Seifi & C., Zimmermann, J., 2016. Machine scheduling in underground mining:
An application in the potash industry. OR Spectrum 38(2): 365–403.
Schulze, M., Zimmermann, J., 2017. Staff and machine shift scheduling in a German potash mine.
Journal of Scheduling 20(6): 635–656.
