Current Program
Unit F101
Light gas oil
Marine diesel
White spirit
Turbo jet JP4
Supply dept requirement
750 Mbpsd
235 Mbpsd
40 Mbpsd
181 Mbpsd
Refinery make
668
202
40
181
Supply must have absolute minimum of 725 Mbpsd of light gas oil, i.e., +57 MBs
Can stand only 152 MBs of marine diesel, i.e., À50 MBs
Action: Change kero/gas oil operation to kero/diesel operation
Preparing an Operating Program
In present day refining industry, both the running plan and the subsequent operating
programs are computerized. However, their preparation requires the same input as
the old manual system. In the case of the operating program, these would follow the
sequence listed below:
1. In order to begin assembling the operating program, the planner will need to
know the following details:
• The running plan for the refinery for the month in question.
• The latest crude slate data.
• What plants are scheduled for shutdown during the life of the program?
• Estimate of the intermediate product stocks (Appendix 3).
2. Prepare an outline operating schedule to meet intermediate product requirements
and timed to maintain adequate intermediate products in tankage (Appendix 4).
3. Cut the crude(s) TBP into the required product cuts, for the crude unit operation.
4. Cut the product from the other units (such as FCCU and cat reformer) to meet
intermediate products.
T/JET Dist. 2486
71,680
T.JET 2486
142,065
To/From Store
6,456
78,136
4.5 days
@8,000 B/D
HS–2
40,800
78,136
52,564
SRN.
Re-Run
Still 13
11,368
33,600
11,075
18,360
Doctor
Plant.
Fuel
CS4
CS4
Gasoline
MB’s
141
295
Prem Kero
297,600
Reg Kero
SO 2 Treat
Reg. Kero
SO 2 Treat
Prem Kero
To/From Store
(80%)
297,600
74,400
372,000
To/From Store
90
Kero Dist
371,910
31 days@12,000
B/D
Fig. 2 A typical middle distillate schedule
698
D.S.J. Jones and P.R. Pujado ´
Précédent

- 707/1908