Operating Parameters Optimization of Natural Gas Purification Plant
283
Fig. 3. Process model diagram established by Aspen HYSYS.
The operating parameters are optimized by using EnPI as a fitness function. Under
the optimized operating parameters, the unit energy consumption of the purification plant
is reduced by 8.86% compared to before the optimization. Table 3 shows the operating
parameters and unit energy consumption of on-site and optimized.
283
Fig. 3. Process model diagram established by Aspen HYSYS.
The operating parameters are optimized by using EnPI as a fitness function. Under
the optimized operating parameters, the unit energy consumption of the purification plant
is reduced by 8.86% compared to before the optimization. Table 3 shows the operating
parameters and unit energy consumption of on-site and optimized.