Openness to foreign co-operation
Increased vulnerability of transmission
grid to extreme weather
Public interest in climate change
Imported offshore wind and CSP
Complex permitting for infrastructure
Insufficient ‘Swissness’ for public support
Conflicting views of ES2050
Health of the Swiss economy
Further cost reductions for wind and CSP
Uncertainties
Figure 9.3 Main risks associated with expansion of imported renewables for Switzerland.
Note
Assumes no significant changes in public interest in climate change, openness to imported electricity, downturn in the Swiss economy, and ongoing
slow reductions in costs of wind and CSP plants.
Most significant risks
Implementation risks
•
•
•
•
C
o
n
s
e
q
u
e
n
t
i
a
l
r
i
s
k
s
a
s
c
o
g
n
it
iv
e
b
a
r
ri
e
rs
Openness to foreign co-operation
Increased vulnerability of transmission
grid to extreme weather
Public interest in climate change
Imported offshore wind and CSP
Complex permitting for infrastructure
Insufficient ‘Swissness’ for public support
Conflicting views of ES2050
Health of the Swiss economy
Further cost reductions for wind and CSP
Uncertainties
Figure 9.3 Main risks associated with expansion of imported renewables for Switzerland.
Note
Assumes no significant changes in public interest in climate change, openness to imported electricity, downturn in the Swiss economy, and ongoing
slow reductions in costs of wind and CSP plants.