in all cases, will be to assess the merits of alternative schemes (e.g. how many ways
are there for travelling between points A and B: rail, lorry, car, bus, bicycle, sea, air)
and to select the most suitable, to pave the way for the preparation of a suitable and
economic design and to foresee and plan for problems that may arise during
construction.
(Social ) Needs
Without or With
Project ?
(Social ) Objectives
Technical Objectives
Basic Data
Feasibility
and Analysis
Study
Assessment
Alternative Plans
Selection of Plan
Final Design
Tendering
Supervision
Tender Appraisal
Construction
Operation
Management
Fig. 22.5 The project cycle
638
22 Infrastructure Implementation
Précédent

- 657/700

Suivant