182
I. K. Umar et al.
Highways Agency (2006) Pavement design and maintenance Part 3 HD 26/06. In: Design manual
for road and bridges. Department of Transport, Middlesex
Khan RU, Khan MI, Khan AU (2012) Software development (PAKPAVE ) for flexible pavement
design, pp 1–5
Kumar RV, Pavithra M (2016) Experimental study on design of flexible pavement using CBR
method. 6890:63–68
Lavin PG (2003) Asphalt pavement: a practical guide to design, production, and maintenance for
engineers and architects. Spon Press
McElvaney J, Snaith MS (2012) Analytical design of flexible pavements. In: Highways, pp 395–423
Nicholas JG, Lester AH (2002) Traffic and highway engineering. Third Edit, Brools/Cole, Virginia
Ozsahin DU, Uzun B, Musa MS et al (2017) Evaluating nuclear medicine imaging devices using
fuzzy PROMETHEE method. Proc Comput Sci 120:699–705. https://doi.org/10.1016/j.procs.
2017.11.298
Pereira P, Pais J (2017) Main flexible pavement and mix design methods in Europe and challenges
for the development of an European method. J Traffic Transp Eng 4:316–346. https://doi.org/10.
1016/j.jtte.2017.06.001
Perraton D, Baaj H, Carter A (2010) Comparison of some pavement design mathods from a fatigue
point of view: effct of fatigue properties of asphalt materials. Road Mater Pavement Des 11:833–
861. https://doi.org/10.3166/rmpd.11.833-861
Rogers M (2003) Highway engineering. Blackwell Science Oxford, UK
Saha J, Nassiri S, Soleymani H, Bayat A (2012) A comparative study between the alberta
transportation flexible pavement design and the MEPDG. Int J Pavement Res Technol 5:379–385
Uzun D, Uzun B, Sani M, Ozsahin I (2018) Evaluating x-ray based medical imaging devices with
fuzzy preference ranking organization method for enrichment evaluations. Int J Adv Comput Sci
Appl 9. https://doi.org/10.14569/IJACSA.2018.090302
Wang TC, Chen LY, Chen YH (2008) Applying fuzzy PROMETHEE method for evaluating
is outsourcing suppliers. In: Proceedings—5th international conference on fuzzy systems and
knowledge discovery, FSKD 2008, pp 361–365
Yahaya AB, Ako T, Jimoh YA (2018) A comparative study of contemporary flexible pavement
design methods in nigeria based on costs. Int J Civ Eng Constr Sci 5:7–16
I. K. Umar et al.
Highways Agency (2006) Pavement design and maintenance Part 3 HD 26/06. In: Design manual
for road and bridges. Department of Transport, Middlesex
Khan RU, Khan MI, Khan AU (2012) Software development (PAKPAVE ) for flexible pavement
design, pp 1–5
Kumar RV, Pavithra M (2016) Experimental study on design of flexible pavement using CBR
method. 6890:63–68
Lavin PG (2003) Asphalt pavement: a practical guide to design, production, and maintenance for
engineers and architects. Spon Press
McElvaney J, Snaith MS (2012) Analytical design of flexible pavements. In: Highways, pp 395–423
Nicholas JG, Lester AH (2002) Traffic and highway engineering. Third Edit, Brools/Cole, Virginia
Ozsahin DU, Uzun B, Musa MS et al (2017) Evaluating nuclear medicine imaging devices using
fuzzy PROMETHEE method. Proc Comput Sci 120:699–705. https://doi.org/10.1016/j.procs.
2017.11.298
Pereira P, Pais J (2017) Main flexible pavement and mix design methods in Europe and challenges
for the development of an European method. J Traffic Transp Eng 4:316–346. https://doi.org/10.
1016/j.jtte.2017.06.001
Perraton D, Baaj H, Carter A (2010) Comparison of some pavement design mathods from a fatigue
point of view: effct of fatigue properties of asphalt materials. Road Mater Pavement Des 11:833–
861. https://doi.org/10.3166/rmpd.11.833-861
Rogers M (2003) Highway engineering. Blackwell Science Oxford, UK
Saha J, Nassiri S, Soleymani H, Bayat A (2012) A comparative study between the alberta
transportation flexible pavement design and the MEPDG. Int J Pavement Res Technol 5:379–385
Uzun D, Uzun B, Sani M, Ozsahin I (2018) Evaluating x-ray based medical imaging devices with
fuzzy preference ranking organization method for enrichment evaluations. Int J Adv Comput Sci
Appl 9. https://doi.org/10.14569/IJACSA.2018.090302
Wang TC, Chen LY, Chen YH (2008) Applying fuzzy PROMETHEE method for evaluating
is outsourcing suppliers. In: Proceedings—5th international conference on fuzzy systems and
knowledge discovery, FSKD 2008, pp 361–365
Yahaya AB, Ako T, Jimoh YA (2018) A comparative study of contemporary flexible pavement
design methods in nigeria based on costs. Int J Civ Eng Constr Sci 5:7–16
