14 Risk Assessment for the Twenty-First Century
• evaluate the premature failure of a structure.
The link between the context of space or drone observation “rich data” and the
risk assessment platform uses Bayesian updates of probabilities, frequencies and
other selected parameters to distill the data used in the risk assessment. Connecting a
dynamic quantitative risk analysis platform with a high-performance data gathering
technique reduces costs, avoids blunders, and constitutes a healthy management
practice, especially for long-term projects requiring short- or long-term monitoring,
including, of course, site restorations.
References
[AG TMH 2016] Australian Government (2016) Tailings Management: Leading Practice Sustainable Development Program for the Mining Industry. https://www.industry.gov.au/sites/g/files/
net3906/f/July%202018/document/pdf/tailings-management.pdf
[ANCOLD 2003] Australian National Committee on Large Dams (2003) Guidelines on risk assessment. Sydney: ANCOLD
Barker M (2011) Australian risk approach for assessment of dams. In: The 21st century dam design
— advances & adaptations. Proceedings of the 31st Annual USSD Conference, San Diego, CA.
Denver, US: Society on Dams
Brown ET (2017) Reducing risks in the investigation, design and construction of large concrete
dams Journal of Rock Mechanics and Geotechnical Engineering 9(2): 197–209
Fischhoff B, Lichenstein S, Slovic P, Derby SC, Keeney R (1982) Acceptable risk. Cambridge MA,
Cambridge University Press
[ICMM Review 2016] International Council on Mining & Metals (2016) The International Council
on Mining and Metals, 2016 Annual Review, Enhancing Mining’s contribution to society https://
www.icmm.com/website/publications/pdfs/annual-review/2016_icmm_annual-review
[ICOLD 2013] International Commission on Large Dams (2013). Sustainable design and postclosure performance of tailings dams, Bulletin 153, ICOLD, Paris
Oboni C, Oboni F (2013) Factual and Foreseeable Reliability of Tailings Dams and Nuclear Reactors
-a Societal Acceptability Perspective, Tailings and Mine Waste 2013, Banff, AB, November 6 to
9, 2013
Oboni C, Oboni F (2018) Geoethical consensus building through independent risk assessments.
Resources for Future Generations 2018 (RFG2018), Vancouver BC, June 16–21, 2018
Oboni F, Oboni C (2016) A systemic look at tailings dams failure process, Tailings and Mine Waste
2016, Keystone CO, USA, October 2–5, 2016 https://www.riskope.com/wp-content/uploads/
2016/10/Paper-17_A-systemic-look-at-TD-failure-TMW-2016_07-11_revised.pdf
Oboni F, Oboni C (2017) Screening Level Risk Assessment for a Portfolio of Tailings Dams,
Canadian Dam Association (CDA, ACB) Bulletin 28(4): 17–29
[Oboni et al. 2014] Oboni F, Oboni C, Caldwell J (2014) Risk assessment of the long-term performance of closed tailings, Tailings and Mine Waste 2014, Keystone CO, USA, October 5–8,
2014
[Oboni et al. 2019] Oboni F, Oboni C, Morin R (2019) Innovation in Dams Screening Level Risk
Assessment, International Commission on Large Dams/Commission Internationale des Grands
Barrages (ICOLD/CIGB), Ottawa, Canada, June 9–14, 2019
[Oboni et al. 2013] Oboni F, Oboni C, Zabolotniuk S (2013) Can We Stop Misrepresenting Reality
to the Public?, CIM 2013, Toronto. https://www.riskope.com/wp-content/uploads/Can-We-StopMisrepresenting-Reality-to-the-Public.pdf
[Rio Tinto 2015] Rio Tinto Management System (2015) Standard https://www.riotinto.com/
documents/RT_Management_System_Standard_2015.pdf
14 Risk Assessment for the Twenty-First Century
• evaluate the premature failure of a structure.
The link between the context of space or drone observation “rich data” and the
risk assessment platform uses Bayesian updates of probabilities, frequencies and
other selected parameters to distill the data used in the risk assessment. Connecting a
dynamic quantitative risk analysis platform with a high-performance data gathering
technique reduces costs, avoids blunders, and constitutes a healthy management
practice, especially for long-term projects requiring short- or long-term monitoring,
including, of course, site restorations.
References
[AG TMH 2016] Australian Government (2016) Tailings Management: Leading Practice Sustainable Development Program for the Mining Industry. https://www.industry.gov.au/sites/g/files/
net3906/f/July%202018/document/pdf/tailings-management.pdf
[ANCOLD 2003] Australian National Committee on Large Dams (2003) Guidelines on risk assessment. Sydney: ANCOLD
Barker M (2011) Australian risk approach for assessment of dams. In: The 21st century dam design
— advances & adaptations. Proceedings of the 31st Annual USSD Conference, San Diego, CA.
Denver, US: Society on Dams
Brown ET (2017) Reducing risks in the investigation, design and construction of large concrete
dams Journal of Rock Mechanics and Geotechnical Engineering 9(2): 197–209
Fischhoff B, Lichenstein S, Slovic P, Derby SC, Keeney R (1982) Acceptable risk. Cambridge MA,
Cambridge University Press
[ICMM Review 2016] International Council on Mining & Metals (2016) The International Council
on Mining and Metals, 2016 Annual Review, Enhancing Mining’s contribution to society https://
www.icmm.com/website/publications/pdfs/annual-review/2016_icmm_annual-review
[ICOLD 2013] International Commission on Large Dams (2013). Sustainable design and postclosure performance of tailings dams, Bulletin 153, ICOLD, Paris
Oboni C, Oboni F (2013) Factual and Foreseeable Reliability of Tailings Dams and Nuclear Reactors
-a Societal Acceptability Perspective, Tailings and Mine Waste 2013, Banff, AB, November 6 to
9, 2013
Oboni C, Oboni F (2018) Geoethical consensus building through independent risk assessments.
Resources for Future Generations 2018 (RFG2018), Vancouver BC, June 16–21, 2018
Oboni F, Oboni C (2016) A systemic look at tailings dams failure process, Tailings and Mine Waste
2016, Keystone CO, USA, October 2–5, 2016 https://www.riskope.com/wp-content/uploads/
2016/10/Paper-17_A-systemic-look-at-TD-failure-TMW-2016_07-11_revised.pdf
Oboni F, Oboni C (2017) Screening Level Risk Assessment for a Portfolio of Tailings Dams,
Canadian Dam Association (CDA, ACB) Bulletin 28(4): 17–29
[Oboni et al. 2014] Oboni F, Oboni C, Caldwell J (2014) Risk assessment of the long-term performance of closed tailings, Tailings and Mine Waste 2014, Keystone CO, USA, October 5–8,
2014
[Oboni et al. 2019] Oboni F, Oboni C, Morin R (2019) Innovation in Dams Screening Level Risk
Assessment, International Commission on Large Dams/Commission Internationale des Grands
Barrages (ICOLD/CIGB), Ottawa, Canada, June 9–14, 2019
[Oboni et al. 2013] Oboni F, Oboni C, Zabolotniuk S (2013) Can We Stop Misrepresenting Reality
to the Public?, CIM 2013, Toronto. https://www.riskope.com/wp-content/uploads/Can-We-StopMisrepresenting-Reality-to-the-Public.pdf
[Rio Tinto 2015] Rio Tinto Management System (2015) Standard https://www.riotinto.com/
documents/RT_Management_System_Standard_2015.pdf