8 System Definition
Fig. 8.3 Single TSF with one dam
Fig. 8.4 TSF with three dams
P
Z
P
S
C
Bottom
Sump
2
12
2 2
4
5
6
7
8
9
10
11
3
Could be demolished and
is not included in the analyses.
13
14
15
16
17
18
Fig. 8.5 Complex mine with all its TSFs, related dams and major pipelines, weirs
18 elements shown in Fig. 8.5 were then split into sub-elements as indicated in the
previous two examples, for a total of over 50 elements to be analysed in the mine
risk assessment.
Of course, there are inter-dependencies in this system (the obvious ones are those
resulting from “cascading” ponds) that have to be considered in the analyses.
8 System Definition
Fig. 8.3 Single TSF with one dam
Fig. 8.4 TSF with three dams
P
Z
P
S
C
Bottom
Sump
2
12
2 2
4
5
6
7
8
9
10
11
3
Could be demolished and
is not included in the analyses.
13
14
15
16
17
18
Fig. 8.5 Complex mine with all its TSFs, related dams and major pipelines, weirs
18 elements shown in Fig. 8.5 were then split into sub-elements as indicated in the
previous two examples, for a total of over 50 elements to be analysed in the mine
risk assessment.
Of course, there are inter-dependencies in this system (the obvious ones are those
resulting from “cascading” ponds) that have to be considered in the analyses.