362
G. Kumar and H. Gupta
installed in Isparta, Turkey, for performance analysis. The investigation is carried out
on August 2, 2012, by taking water as a working fluid. Inlet and exit temperatures of
water were recorded to find the maximum temperature difference. Water was allowed
to flow at 0.025 kg/s while the peak efficiency of 34.1% was noted during the day.
Experimental setup at a telecommunication company of South Africa: Fig. 10
shows an industrial setup, which is in operation at the data center of a telecommunication company. It is installed on the rooftop to meet the peak cooling capacity
of 330 kW of a lithium bromide water absorption chiller. It is designed for water
heating up to 180 °C and 12 bar pressure while the return temperature is 165 °C.
The provision is made to vary the flow rate of the water, and mirrors are focussed or
defocused to meet the need. The system is equipped with safety protocols for urgent
situations.
Experimental setup at the mining site in Aydin, Turkey: Fig. 11 shows an experimental setup that is installed in a mining site of Ayudin, Turkey. It is designed for the
Fig. 10 The rooftop installation in South Africa [28]
Fig. 11 LFC setup installed in mining site of Turkey [29]
G. Kumar and H. Gupta
installed in Isparta, Turkey, for performance analysis. The investigation is carried out
on August 2, 2012, by taking water as a working fluid. Inlet and exit temperatures of
water were recorded to find the maximum temperature difference. Water was allowed
to flow at 0.025 kg/s while the peak efficiency of 34.1% was noted during the day.
Experimental setup at a telecommunication company of South Africa: Fig. 10
shows an industrial setup, which is in operation at the data center of a telecommunication company. It is installed on the rooftop to meet the peak cooling capacity
of 330 kW of a lithium bromide water absorption chiller. It is designed for water
heating up to 180 °C and 12 bar pressure while the return temperature is 165 °C.
The provision is made to vary the flow rate of the water, and mirrors are focussed or
defocused to meet the need. The system is equipped with safety protocols for urgent
situations.
Experimental setup at the mining site in Aydin, Turkey: Fig. 11 shows an experimental setup that is installed in a mining site of Ayudin, Turkey. It is designed for the
Fig. 10 The rooftop installation in South Africa [28]
Fig. 11 LFC setup installed in mining site of Turkey [29]