310
Index
Canadian Forces Base (CFB), 25
Carbon tetrachloride (CTC), 250
Case study of PRB application, 249
BIP and surrounds, 255
botany groundwater location
plan, 252
clone libraries composition, 272
full-scale reactive iron barrier
assessment, 268–270
groundwater monitoring results,
264–267
groundwater quality, 251
groundwater sampling and analysis,
263–264
iron core analysis, 267–268
laboratory column trials, 256–257
Orica, 254
pilot-scale barrier design, 257–263
sampling and analysis, 270–273
selected site, 254–255
Stage 2 Botany Groundwater
Survey, 253
ZVI PRB technology, 254
CEI, see Canadian Environment
Industry (CEI)
CFB, see Canadian Forces Base (CFB)
CHC, see Chlorinated hydrocarbon
(CHC)
Chemical monitoring, 138
Chemical oxygen demand (COD), 263
Chemical precipitation, 157
Chlorinated aliphatic hydrocarbon
(CAH), 296
Chlorinated hydrocarbon (CHC), 45,
249, 252, 265, 281
dissolved, 268
plumes, 42
Chlorinated volatile organic compounds
(cVOCs), 87, 281, 282
Chromium, 102, 105
concentration, 103
cumulative-distribution diagrams,
104
treatment, 102
CLC, see Community Liaison
Committee (CLC)
COD, see Chemical oxygen demand
(COD)
Cofferdam approach, 55
Color-Tec kit, 112
Column experiments, 222–223
Column runs
adsorption isotherms from, 233–234
compound ranking from, 234–238
Community Liaison Committee
(CLC), 254
Compound-specific isotope analysis
(CSIA), 32
Conceptual site model (CSM), 64
Cone penetration tools (CPT), 192
Construction techniques, PRB, 53,
166–167; see also Engineering
design methodology, PRB
excavation techniques, 54–57
injection techniques, 57–59
Contaminated sites, 1
Continuous PRBs, 50
Continuous reactive barrier (CRB), 14,
15, 278, 279
Continuous trenching, 54–55
CPT, see Cone penetration tools (CPT)
CRB, see Continuous reactive barrier
(CRB)
CRC CARE, 79
CSIA, see Compound-specific isotope
analysis (CSIA)
CSM, see Conceptual site model (CSM)
CTC, see Carbon tetrachloride (CTC)
Cut-off walls, 14
cVOCs, see Chlorinated volatile organic
compounds (cVOCs)
Cyclovoltagram (CV), 89
D
D&G system, see Drain-and-gate system
(D&G system)
Damkoehler number (Da), 188
Damplands, 112, 113
Darcy’s law, 66
DART, see Deep aquifer remediation
tools (DART)
DCE, see Dichloroethene (DCE)
DCM, see Dichloromethane (DCM)
Deep aquifer remediation tools (DART),
166
Denitrification bench-scale tests, 117
bases for postulation, 118
Index
Canadian Forces Base (CFB), 25
Carbon tetrachloride (CTC), 250
Case study of PRB application, 249
BIP and surrounds, 255
botany groundwater location
plan, 252
clone libraries composition, 272
full-scale reactive iron barrier
assessment, 268–270
groundwater monitoring results,
264–267
groundwater quality, 251
groundwater sampling and analysis,
263–264
iron core analysis, 267–268
laboratory column trials, 256–257
Orica, 254
pilot-scale barrier design, 257–263
sampling and analysis, 270–273
selected site, 254–255
Stage 2 Botany Groundwater
Survey, 253
ZVI PRB technology, 254
CEI, see Canadian Environment
Industry (CEI)
CFB, see Canadian Forces Base (CFB)
CHC, see Chlorinated hydrocarbon
(CHC)
Chemical monitoring, 138
Chemical oxygen demand (COD), 263
Chemical precipitation, 157
Chlorinated aliphatic hydrocarbon
(CAH), 296
Chlorinated hydrocarbon (CHC), 45,
249, 252, 265, 281
dissolved, 268
plumes, 42
Chlorinated volatile organic compounds
(cVOCs), 87, 281, 282
Chromium, 102, 105
concentration, 103
cumulative-distribution diagrams,
104
treatment, 102
CLC, see Community Liaison
Committee (CLC)
COD, see Chemical oxygen demand
(COD)
Cofferdam approach, 55
Color-Tec kit, 112
Column experiments, 222–223
Column runs
adsorption isotherms from, 233–234
compound ranking from, 234–238
Community Liaison Committee
(CLC), 254
Compound-specific isotope analysis
(CSIA), 32
Conceptual site model (CSM), 64
Cone penetration tools (CPT), 192
Construction techniques, PRB, 53,
166–167; see also Engineering
design methodology, PRB
excavation techniques, 54–57
injection techniques, 57–59
Contaminated sites, 1
Continuous PRBs, 50
Continuous reactive barrier (CRB), 14,
15, 278, 279
Continuous trenching, 54–55
CPT, see Cone penetration tools (CPT)
CRB, see Continuous reactive barrier
(CRB)
CRC CARE, 79
CSIA, see Compound-specific isotope
analysis (CSIA)
CSM, see Conceptual site model (CSM)
CTC, see Carbon tetrachloride (CTC)
Cut-off walls, 14
cVOCs, see Chlorinated volatile organic
compounds (cVOCs)
Cyclovoltagram (CV), 89
D
D&G system, see Drain-and-gate system
(D&G system)
Damkoehler number (Da), 188
Damplands, 112, 113
Darcy’s law, 66
DART, see Deep aquifer remediation
tools (DART)
DCE, see Dichloroethene (DCE)
DCM, see Dichloromethane (DCM)
Deep aquifer remediation tools (DART),
166
Denitrification bench-scale tests, 117
bases for postulation, 118
