Ortiz, C. A. (2006). Kaizen Assembly: Designing, Constructing, and Managing a Lean Assembly Line. Assembly
Automation (Vol. 27). Boca Raton: Taylor & Francis.
https://doi.org/10.1108/aa.2007.03327aae.001
Puvanasvaran, A. P., Mei, C. Z., & Alagendran, V. A. (2013).
Overall Equipment Efficiency Improvement Using Time
Study in an Aerospace Industry. Procedia Engineering, 68, 271–277. https://doi.org/10.1016/j.proeng.2013.
12.179
Rahman, H., & Amin, A. (2016). An Empirical Analysis
of the Effective Factors of the Production Efficiency in
the Garments Sector of Bangladesh. European Journal of
Advances in Engineering and Technology, 3(3), 30–36.
Rajkishore, N., & Padhye, R. (2015). Garment Manufacturing Technology. Cambridge,UK: Elsevier Ltd.
Russell, R. S., & Taylor, B. W. (2011). Operations Management: Creating Value Along the Supply Chain (7th ed.).
US: John Wiley and Sons, Inc.
Senthilraja, V., Aravindan, P., & Sathesh, kumar A. (2018).
Man Power Productivity Improvement through Operator
Engagement Time Study. In 1st International Conference
on Recent Research in Engineering and Technology 2018
(Vol. 4, pp. 1052–1065). Tamil Nadu, India: Exporations
on Engineering Letters.
Sibanda, W., & Pretorius, P. (2011). Application of Two-level
Fractional Factorial Design to Determine and Optimize
the Effect of Demographic Characteristics on HIV Prevalence using the 2006 South African Annual Antenatal HIV
and Syphilis Seroprevalence data. International Journal
of Computer Applications, 35(12), 15–20.
Starovoytova, D. (2017). Time study of Rotary Screen Printing Operation. Industrial Engineering Letters, 07(04),
24–35.
Sudarshan, B., & Rao, D. N. (2014). Productivity improvement through modular line in Garment industries. In 5th
International & 26thAll India ManufacturingTechnology,
Design and Research Conference (AIMTDR) (pp. 1–6).
Assam, India.
Uddin, M. M. (2015). Productivity Improvement of Cutting,
Sewing and Finishing Sections of a Garment Factory
Through Value Stream Mapping – a Case Study. Master Thesis, Dhaka: Bangladesh University of Engineering
and Technology,Department of industrial and production
engineering.
Wolff, E. A. (2020). The global politics of African industrial
policy: the case of the used clothing ban in Kenya, Uganda
and Rwanda. Review of International Political Economy,
1–24.
Yemane, A., Gebremicheal, G., Meraha, T., & Hailemicheal,
M. (2020). Productivity Improvement through Line Balancing by Using Simulation Modeling ( Case study
Almeda Garment Factory ). Journal of Optimization in
Industrial Engineering, 13(1), 153–165.
Yemane, A., Haque, S., & Malfanti, I. (2017). Optimal Layout
Design by Line Balancing Using Simulation Modeling. In
Proceedings of the International Conference on Industrial
Engineering and Operations Management (pp. 228–245).
Bogotá, Colombia: IEOM society international.
83
Précédent

- 108/340

Suivant