OAM 9 WAS CONSTRUCTED AND BEGAN OPERATION IN YEAR
?
DAM 12 WAS CONSTRUCTED AND BEGAN OPERATION IN YEAR
3
DAM ft WAS CONSTRUCTED AND BEGAN OPERATION IN YEAR
9
THE TOTAL PRESENT VALUE OF EARNINGS = 147529961 DOLLARS
Β.2.
Intermediate Results
Results
231
Table B.5
Feasible Solution
FEASIBLE SOLUTION NUM«EP
1
OAM 9 WAS CONSTRUCTED AND BEGAN OPERATION IN YEAR
?
DAM 12 WAS CONSTRUCTED AND BEGAN OPERATION IN YEAR
3
DAM ft WAS CONSTRUCTED AND BEGAN OPERATION IN YEAR
9
THE TOTAL PRESENT VALUE OF EARNINGS = 147529961 DOLLARS